Understand what your design is likely to need in materials and work before you build. A bill of quantities organised by work section gives you a clearer basis for budgets and contractor quotations.
Serving Thiruvananthapuram, Kottayam, Ernakulam and Thrissur districts in Kerala.
Service overview
A building estimate measures quantities from the drawings (excavation, concrete, steel, masonry, plastering, flooring, doors, windows and finishes) and applies the rates and specifications agreed for the estimate.
A bill of quantities (BOQ) lists those items by work section, so that contractors can price the same scope and you can compare quotations like for like. Allowances, provisional sums and exclusions are written down, so you can see what is not yet decided.
Early estimates from outline drawings are less precise than detailed estimates from a full drawing set. The level of detail is agreed with you at the start.
This page covers estimates prepared from design drawings. Tracking costs during construction is covered by construction budget and cost control.
How it works
Each stage is confirmed with you before it begins. Scope, revisions and responsibilities are written down.
Agree drawings, specifications and estimate detail.
Take off quantities by work section.
Apply the agreed pricing basis and allowances.
Walk through assumptions and exclusions with you.
The coordinated drawing set (site plan, floor plans, sections and elevations) for permit and construction stages.
Explore building plans and architectural drawingsTrack cost information against an agreed project budget, BOQ or procurement plan.
Explore construction budget and cost controlPlan a new home build around its drawings, site conditions, specifications and agreed construction responsibilities.
Explore home constructionQuestions
A per-square-foot figure hides most of the decisions that drive cost, and no standard rate is published on this site. An estimate is prepared from your drawings and specifications instead.
No. An estimate is a measured assessment based on stated assumptions. Contractor quotations and final costs depend on the agreed construction scope, market rates and site conditions.
An early estimate can be prepared from outline drawings, with wider allowances. It should be updated as the design develops.
Changes to the design, specifications, quantities or market rates can change cost. Assumptions are listed so that changes can be tracked.
Building estimation and BOQ