Building estimation and BOQ

Building estimation and BOQ from your drawings

Understand what your design is likely to need in materials and work before you build. A bill of quantities organised by work section gives you a clearer basis for budgets and contractor quotations.

Serving Thiruvananthapuram, Kottayam, Ernakulam and Thrissur districts in Kerala.

Illustrative image of a modern dining area beside an open staircaseIllustrative image

Service overview

An estimate is only as good as its inputs.

A building estimate measures quantities from the drawings (excavation, concrete, steel, masonry, plastering, flooring, doors, windows and finishes) and applies the rates and specifications agreed for the estimate.

A bill of quantities (BOQ) lists those items by work section, so that contractors can price the same scope and you can compare quotations like for like. Allowances, provisional sums and exclusions are written down, so you can see what is not yet decided.

Early estimates from outline drawings are less precise than detailed estimates from a full drawing set. The level of detail is agreed with you at the start.

This page covers estimates prepared from design drawings. Tracking costs during construction is covered by construction budget and cost control.

What an estimation scope can include

  • An agreed measurement basis, drawing revision and pricing basis
  • Quantities organised by work section
  • A BOQ format suitable for comparing contractor quotations
  • A list of assumptions, allowances and exclusions
  • Items flagged where drawings or specifications are incomplete

Useful information to share

  • The latest drawing set, including structural drawings if available
  • Specifications or preferences for key materials and finishes
  • Scope boundaries, such as compound wall, sump or landscaping
  • Whether you need an early-stage or a detailed estimate

How it works

How building estimation and boq works.

Each stage is confirmed with you before it begins. Scope, revisions and responsibilities are written down.

  1. 01

    Scope

    Agree drawings, specifications and estimate detail.

  2. 02

    Measure

    Take off quantities by work section.

  3. 03

    Price

    Apply the agreed pricing basis and allowances.

  4. 04

    Review

    Walk through assumptions and exclusions with you.

Related services

Services that often come next.

View all architectural design services

Home construction

Plan a new home build around its drawings, site conditions, specifications and agreed construction responsibilities.

Explore home construction

Questions

Frequently asked questions.

Can you give me a per-square-foot rate?

A per-square-foot figure hides most of the decisions that drive cost, and no standard rate is published on this site. An estimate is prepared from your drawings and specifications instead.

Is an estimate the same as a quotation?

No. An estimate is a measured assessment based on stated assumptions. Contractor quotations and final costs depend on the agreed construction scope, market rates and site conditions.

Can I get an estimate before the drawings are finished?

An early estimate can be prepared from outline drawings, with wider allowances. It should be updated as the design develops.

Will the estimate change during construction?

Changes to the design, specifications, quantities or market rates can change cost. Assumptions are listed so that changes can be tracked.

Building estimation and BOQ

Send us your drawings and the level of estimate you need.

Request a building estimate discussion